News Category: Cleanroom Supplier
Bid Won to Supply Internal Maintenance Cranes Through 2024
6/23/2022
Zinter is pleased to announce an order was received to provide multiple custom engineered internal maintenance cranes for the next two years. Zinter’s on-going partnership has provided this semiconductor company a handling solution tailored to both their product and the semiconductor environment in which they operate. Without these state-of-t...
Uniquely Positioned to Supply Spare Parts & Repair Assistance
4/6/2022
Finding critical spare parts and knowledgeable technicians for repairs to maintain semiconductor handling service equipment is a challenge given the current global climate of post-COVID material shortages, reduced or limited labor forces, and increased transportation and energy costs. Zinter is positioned as a supplier for individual parts, whole a...
Zinter wins contract to supply the world’s first customer High-NA crane system
3/24/2022
The world’s first semiconductor system capable of production output of 5 nanometer chips and below will be supported by purchased indoor cranes from Zinter Cleanroom Cranes. In a groundbreaking contract, a USA based semiconductor company has purchased the world’s most advanced lithography tools (ASML’s High-NA EUV system) and the ...
Zinter fights global chip shortage with multiple EUV Crane installations in Ireland
11/20/2021
The world continues to face industry crippling chip shortages delaying major supplies for every major sector. Zinter provides strong support to the global chip recovery by supplying EUV cranes around the world. Today, a multiple set installation was completed in Ireland, marking a strong turn towards moving past chip shortages. Zinter looks forward...
Zinter awarded new international installation contract for 10-tonne crane systems
12/12/2019
Zinter has been awarded a contract to provide (3) sets10-tonne crane systems for a customer in Ireland. The system is to be rated for ISO 5 Environment. Delivery of the system including SAT to be completed Q3 2020....
Zinter provides cleanroom crane and hoist to semiconductor metrology customer in San Jose, CA
7/2/2019
Zinter has won the contract to provide a semiconductor metrology customer (1) 500-kg belt style hoist system operating on a customized monorail as an integral internal piece of maintenance equipment. This unit is the first prototype and is planned on future deliveries with each tool. Delivery of the first unit has been completed and installation sc...
Zinter awarded equipment supplier to aerospace company MTorres, located in Everette, WA.
6/26/2019
Zinter has won the contract to provide an aerospace customer (4) tandem operating BH2 model 1-Ton capacity cleanroom “belt” style hoists. Delivery has been completed and installation is scheduled to be completed Q1 2020. Specifics include:
2 falls of belt, true vertical lift, upper and lower geared limits, lug mounted, ISO 7 env...
Installation and runway construction contract awarded to Zinter from customer in Wilton, CT.
2/4/2019
Zinter has been awarded a contract to provide a set of 20-tonne capacity ISO 5 cleanroom cranes with runways for a customer in Wilton, CT. Zinter will be fabricating the associated runway system to match the ISO 5 classification necessary for the project. This crane system is the most advance design for semiconductor manufacturing to-date and the f...
New contract in Phoenix, Arizona
3/28/2018
Zinter has been awarded a contract to provide (1) 250 LB. capacity - Crane and Runway System for a customer in Phoenix AZ, USA. The system is designed utilizing a Zinter E-Hoist (Belt Style) and includes automation to meet customers process recipes. Design is ISO 5 Environment. Delivery of the system including SAT to be completed in Q2 2018....
New hoist delivery in pharmacy segment
3/23/2018
Zinter has been awarded an order for a Zinter E Hoist 250 LB. capacity for a pharmaceutical company project in Mexico. The system is rated for ISO 5 Environment. Delivery of the system is completed.
...
System delivery with Zinter-E-Hoist in Boise
3/14/2018
Zinter has been awarded a contract to provide (1) 250 LB. capacity - Crane and Runway System for a customer in Boise ID, USA. The system is designed utilizing a Zinter E-Hoist (Belt Style) for ISO 5 Environments. Delivery of the systems including SAT to be completed in Q2 2018....
New contract 8-Tonne crane system
2/15/2018
Zinter has been awarded a contract to provide (2) 8-Tonne crane systems for a customer in San Diego, CA, USA. The system and support runways are to be rated for ISO 7 Environment. Delivery of the system including SAT was successfully completed in Q2 2018....
New Crane and Runway system in Colorado Springs
2/13/2018
Zinter has been awarded a contract to provide (1) 1250 LB. capacity ceiling mounted (Low-Headroom) crane system. Crane and Runway System is for a customer in Colorado Springs CO, USA. Designed for ISO 7 Environment. Delivery of the system including SAT to be completed in Q2 2018....
Delivery of Crane and Runway System
1/18/2018
Zinter has been awarded a contract to provide (1) 200 LB. capacity - Crane and Runway System for a customer in San Diego, CA, USA. The system is designed utilizing (2) Zinter E-Hoists (Belt Style), radio controlled at 100 LBS. each. Designed for ISO 7 Environment. Delivery of the system including SAT is completed in Q1 2018. ...
New crane system in San Diego
11/24/2017
Zinter has been awarded a contract to provide (2) 2-tonne crane systems for a customer in San Diego, CA, USA. The system and support runways are to be rated for ISO 7 Environment. Specific design details and location will be disclosed in the near future by the owner’s representative. Delivery of the system including SAT is completed....
Zinter has been awarded a contract to provide two 10-Tonne crane systems for a customer in Idaho
4/11/2016
Zinter has been awarded a contract to provide (2) 10-Tonne crane systems for a customer in Idaho, USA. The system and support runways are to be rated for ISO 5 Environment. Specific design details and location will be disclosed in the near future by the owner’s representative. Delivery of the system including SAT to be completed&n...
Zinter provides nine pharma hoists
2/18/2016
Pharmaceutical company in State of Georgia USA purchases (9) 1-tonne (997kg) Pharma hoists.
Specifics include:
ATEX markings EX 2Gc Eex de IIB T for hazardous locations.
Special ultra-slow hoist and trolley speeds.
Stainless steel covers along with stainless hook and blocks to meet Bio-Gen requirements.
<...
Zinter supplies equipment to Semiconductor Manufacturer in San Francisco Bay Area
11/20/2015
Zinter supplies equipment to Semiconductor Manufacturer in San Francisco Bay Area, California USA. Scope of work includes: supply, installation and testing of a free standing 1100lb (499kg) cleanroom crane (ISO 5). Startup of crane equipment completed Q4 2015....
Zinter provides clean room crane 900b and technical support
6/11/2015
Zinter provides clean room crane 900lb (408kg) to customer in the Pacific North West. The ISO 5 crane and hoist along with a stainless steel lifting device will be used for tool upgrades.
Zinter field technician gives customers personnel onsite support during the tool shut down period....
ISO 5 crane and runway system
2/11/2015
Zinter provides ISO 5 crane and runway system, (2) at 8-Ton capacity each to Semiconductor Company; San Diego California USA....
Zinter delivers new clean room crane at dpiX, Colorado Springs CO.
2/3/2014
Zinter has delivered a new ISO 7 clean room crane, to dipX, Colorado Springs CO. Included in the crane project, free-standing runway system. The maximum working load of the individual cranes is 3307 kg (3.645 short ton). The completion of the project took 20 weeks....
Zinter awarded prototype design build contract Dec, 2013, Albany NY
12/9/2013
Zinter has been awarded a contract to develop, build and install an ISO 5 lift system for the G450C program. Specific design parameters, customers location and requirements are being compartmentalized within the Zinter organization. Delivery of the system and SAT to be completed in Q4 of 2014....
Zinter awarded crane contract in Southern California.
12/2/2013
Zinter has been awarded a contract to supply two 7257.48 kg (8-Short Ton) clean room cranes ISO 7 for tool build purposes. Each crane system will be a standalone crane and will include special design runway systems to meet California seismic criteria. Delivery and SAT for the system to be completed in Q2 of 2014....
page 1 of 1 : << 1 >> |
Another beautiful morning at Zinter Cleanroom Cranes
Categories
International Partnership
Customer Supplier Contract
Cleanroom Service Contract
Cleanroom Supplier Contract
Cleanroom Supplier & Services Contract
Global Inspection Software